Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,344㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Cierra Umeda Toyosaki | Number of floors | 7階 floor (19floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 2LDK | Year of construction | 2025/1 | |||
| Structure | RC 19-story building | Format | Used apartments | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Low-carbon housing / Energy-saving measures / Immediate delivery available / Access to two or more train lines / Supermarket within 10 minutes' walk / Close to city center / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat ground to station / General hospital within 10 minutes' walk / Bathroom vanity with shower / Countertop kitchen / 24-hour trash disposal / Enhanced security / EV charging facility / Wide balcony / Barrier-free / Double-glazed windows / Auto-bath / High-speed internet access / Heated toilet seat / Intercom with TV monitor / Water-saving toilet / Urban area / Good ventilation / Flooring in all rooms / Walk-in closet / IH cooking heater / Double-glazed windows or double-glazed sash windows in all rooms / Shoe storage / Pet-friendly / BS, CS, CATV / Elementary school within 10 minutes' walk / Flat ground / Elevator / Delivery locker / Bicycle parking space / Adjustable partition / Dishwasher / Motorcycle parking space / Well-maintained sidewalks / All-electric / Garbage disposer (food waste grinder) / Water purifier / Balcony and rooftop water taps / Smart key / High-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
73,814,100 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/19 | |||
| Important Notices | - |
|||||
|
|
||||||


