Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,600㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 31.78 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2026/2 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Eco-point eligible home / energy-saving measures / Flat 35S compatible / solar power generation system / soil survey completed / energy-saving water heater / supermarket within 10 minutes' walk / system kitchen / bathroom dryer / storage in all rooms / quiet residential area / LDK over 15 tatami mats / shaped lot / vanity with shower / face-to-face kitchen / EV charging facility / bathroom over 3.3 sq. m / two-story / double-glazed toilet seat / heated toilet seat / underfloor storage / intercom with TV monitor / water-saving toilet / flooring in all rooms / pantry (storage for dishes and food) / induction cooking heater / staircase in living room / double-glazed or double-glazed windows in all rooms / elementary school within 10 minutes' walk / dishwasher / all-electric / water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
31,780,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/17 | |||
| Important Notices | It is also possible to sell the product with a 5.28kW solar power generation system included, in which case the price will be +1 million yen. *The price is subject to the use of our "roof rental system" where you rent your roof to us and install a solar power generation system. *The solar power generation system will be transferred free of charge after 10 years of power generation. *It is also possible to purchase the product with solar power generation included, in which case the solar power sales income will be earned by the customer. [Notes for the New Year's Limited Price Campaign] ■Customers who sign a contract by 2/28/2026 and will take delivery of the property by 4/30/2026 ■Those who have purchased an eligible pre-built property ■If the contract is terminated for reasons of the customer after the contract is signed, the rights will be invalid. ■These rights cannot be transferred to others or exchanged for money or other items. |
|||||
|
|
||||||

