Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,259㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | [Plus One Style] Eggplant planting 2nd period, plot 1 | Number of floors | floor (3floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/1 | |||
| Structure | Three-story wooden building | Format | Newly built detached house | |||
| Equipment | Flat 35-S compliance certificate / Eco-point eligible home / energy-saving measures / soil surveyed / accessible to more than two train lines / delivery within the fiscal year / system kitchen / bathroom dryer / good sunlight / storage space in all rooms / quiet residential area / LDK over 15 tatami mats / vanity with shower / face-to-face kitchen / 2 toilets / bathroom over 3.3 m2 / balconies on two or more sides / double-glazed glass / heated toilet seat / underfloor storage / window in bathroom / intercom with TV monitor / water-saving toilet / good ventilation / flooring in all rooms / walk-in closet / 3 or more stories / staircase in living room / city gas / shoe closet / dishwasher / low traffic in the area / well-maintained sidewalks / water purifier / smart key / high-performance toilet / built-in garage / Ene-Farm power generation unit installed. / Power Build Construction Method / Power Build Construction Method / Convenient and Secure Smart Home / Restrooms are located on each floor, making them convenient for busy times or when you're not feeling well. / The door phone responds via voice, allowing you to confirm the visitor's name and purpose before answering. / To ensure a home's durability and strength, we use a slab foundation, covering the entire building area with reinforced concrete. The concrete foundation material has a moisture-proofing effect, blocking moisture from the soil in the building area. This provides a longer-lasting, more stable foundation. / Pole-down hardware is a metal fitting that penetrates the building's foundation and base with a single rod and secures it to the pillar. Highly earthquake-resistant hold-down hardware securely connects the foundation and pillar. / We prioritize the health of our residents, using the "foundation packing method" to aim for their health, starting from the very foundation. The "foundation packing method" enhances mold resistance by creating a gap between the foundation and base. / 24mm thick floor slabs are laid across the entire floor on both the first and second floors. They provide a solid base for the flooring material and prevent horizontal twisting of the building. / The breathable waterproof sheet plays an important role in preventing rainwater that cannot be prevented by the exterior wall surface, condensation from inside, or rainwater that has seeped in through small openings caused by years of deterioration from reaching the structure. / The wooden parts under the floor and the wooden parts of the exterior walls are treated both inside and outside with anti-corrosion and anti-termite treatment. All chemicals used are confirmed to be safe, with minimal environmental pollution and minimal impact on the human body. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
29,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/21 | |||
| Important Notices | Semi-fire prevention area |
|||||
|
|
||||||


