Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,258㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Cradle garden Iga, Habikino City, 4th phase, 2 houses | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/11 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Flat 35-S compliance certificate / Energy-saving measures / Flat 35S compatible / Soil survey completed / 2 parking spaces available / Immediate delivery available / Access to more than two train lines / LDK 18 tatami mats or more / Energy-saving water heater / Supermarket within 10 minutes' walk / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Shaped lot / Vanity with shower / Countertop kitchen / Enhanced security / High-roof parking / Wide balcony / Barrier-free / 2 toilets / Bathroom 1 tsubo or larger / 2-story / Double-glazed windows / Auto bath / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Good ventilation / Flooring in all rooms / Stairs in living room / Double-glazed windows or double-glazed sashes in all rooms / City gas / Lighting from two sides in all rooms / Elementary school Within a 10-minute walk / Flat ground / Water purifier / ■Bathroom heater/ventilator/dryer■ The side blow function improves drying efficiency. The side air outlets create airflow that circulates throughout the bathroom, further improving energy efficiency. / ■Bathroom heater/ventilator/dryer remote control■ The clearly-located buttons allow for easy operation of ventilation, heating, drying, and cool air. / ■Water heater remote control■ In addition to temperature adjustment, the clearly-located buttons allow for easy hot water filling and reheating. / ■Built-in stove■ The flat design makes cleaning easy, and the three-burner design with an overheating prevention sensor makes everyday housework a breeze. / ■Sink with built-in water purifier and hand shower■ The spacious convex sink comes standard with a detergent pocket. It allows for neat storage. The water purifier is built into the tip of the faucet, saving space. / ■Intercom with video monitor■ Allows hands-free calls, and the call status can be checked with the call indicator. It is equipped with a monitor function that allows you to check the status of your front door with video and audio, and an LED light that allows you to see the faces of visitors at night. / ■Housing Performance Rating System■ Obtained the highest grade in six categories across four areas of the Housing Performance Rating System. / ■Structural stability■ Evaluates the resistance of the entire building to collapse or damage when subjected to the force of an earthquake. ・Seismic resistance grade (prevention of collapse, etc. of the structural frame) Grade 3 obtained (highest grade) ・Seismic resistance grade (prevention of damage to the structural frame) Grade 3 obtained (highest grade) / ■Deterioration reduction■ Evaluates measures taken to prevent deterioration of the building. ・Deterioration prevention grade (structural frame, etc.) Grade 3 obtained (highest grade) / ■Maintenance considerations■ Evaluates the ease of daily maintenance of hot water supply and drainage pipes and gas pipes. ・Maintenance measures grade Grade 3 obtained (highest grade) / ■Thermal environment and energy consumption | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
24,800,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/15 | |||
| Important Notices | Residential land development work regulation area |
|||||
|
|
||||||


