Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,258㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 29.78 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2026/2 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Eco-point eligible home / energy-saving measures / Flat 35S compatible / solar power generation system / soil survey completed / parking for 3 or more cars / energy-saving water heater / supermarket within 10 minutes' walk / system kitchen / bathroom dryer / storage space in all rooms / LDK over 15 tatami mats / shaped lot / vanity with shower / face-to-face kitchen / EV charging facility / 2 toilets / bathroom over 1 tsubo (3.3 m2) / 2-story / south-facing balcony / double-glazed glass / heated toilet seat / underfloor storage / water-saving toilet / flooring in all rooms / walk-in closet / induction cooking heater / staircase in living room / double-glazed glass or double-glazed sashes in all rooms / elementary school within 10 minutes' walk / dishwasher / all-electric / water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
29,780,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/17 | |||
| Important Notices | Setback: Completed, regulated by the Landscape Act. It is also possible to sell the property with a 6.16kW solar power generation system, in which case the price will be increased by 1 million yen. *The price is subject to the use of our "roof rental system," in which the customer rents their roof to us and installs a solar power generation system. *The solar power generation system will be transferred free of charge after 10 years of power generation. *It is also possible to purchase the property with solar power generation included, in which case the solar power sales income will be earned by the customer. [Notes for the New Year's Limited Price Campaign] ■Customers who sign a contract by February 28, 2026 and whose property will be delivered by April 30, 2026 ■Those who have purchased an eligible pre-built property ■If the contract is terminated for customer reasons after the contract is signed, the rights will be invalid. ■This right cannot be transferred to another person or exchanged for money or other items. Permission has been granted under Article 43, Paragraph 2, Item 2 of the Building Standards Act. |
|||||
|
|
||||||


