Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 0㎜/ Year
National average precipitation: 0㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | [New Arrival December 14th] 3LDK Condominium Eco Town Miyazu E-1 | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK+S (storage room) | Year of construction | 2026/1 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Energy-Saving Measures / Solar Power Generation System / Highly Airtight and Insulated Home / Parking for 3 or More Cars / Access to 2 or More Train Lines / Delivery Within the Fiscal Year / Energy-Saving Water Heater / Mountain View / Bathroom Dryer / Good Sunlight / Storage in All Rooms / South Facing Road / Quiet Residential Area / LDK (Living, Dining, and Kitchen) 15 Tatami Mats or More / Corner Lot / Regular Lot / Rural Landscape / Garden / Vanity with Shower / Countertop Kitchen / EV Charging Station / Barrier-Free / 2 Toilets / Bathroom 1 Tsubo or More / 2-Story Building / Heated Toilet Seat / Intercom with TV Monitor / Water-Saving Toilet / Hardwood Floors in All Rooms / Southwest Facing / Pantry (Storage for Dishes and Food) / Walk-in Closet / All Rooms 6 Tatami Mats or Larger / IH Cooking Heater / Double-Glazed Glass or Double-Glazed Windows in All Rooms / City Gas / Located on High Ground / Flat Land / Located in a newly developed subdivision / storage room / dishwasher / low traffic volume / well-maintained sidewalks / all-electric / smart key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
37,900,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/17 | |||
| Important Notices | Restrictions apply under the Erosion Control Act, residential land development construction restricted area, shadow restrictions apply, corner cuts apply, steps within the site, Article 22 area |
|||||
|
|
||||||


