Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,504㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 42,990,000 yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/6 | |||
| Structure | Two-story wooden building with asphalt shingle roof | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation certificate / Construction housing performance evaluation certificate (new construction) / Building confirmation completion inspection certificate / BELS/Energy saving standard compliance certificate / Flat 35-S compliance certificate / Energy saving measures / Flat 35S compatible / Soil survey completed / 2 parking spaces available / Immediate delivery available / Access to 2 or more train lines / LDK over 20 tatami mats / Energy-saving water heater / Supermarket within 10 minutes' walk / South facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / South facing road / General hospital within 10 minutes' walk / Frontage over 6m / Ground level / Vanity with shower / Countertop kitchen / 2 toilets / Bathroom over 3.3 sq. m / 2-story / South-facing balcony / Auto bath / Heated toilet seat / Underfloor storage / Intercom with TV monitor / No front ridge / Flooring in all rooms / Walk-in closet / All rooms have double-glazed glass or double-glazed sashes / City gas / All rooms have two-sided lighting / Elementary school within 10 minutes' walk / Flat ground / Dishwasher / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
42,990,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/17 | |||
| Important Notices | Restrictions imposed by the Landscape Act, high-altitude district, semi-fire prevention district, greening district |
|||||
|
|
||||||


