Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,522㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 68,990,000 yen (5LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 5LDK | Year of construction | 2017/11 | |||
| Structure | Two-story wooden building | Format | Used detached house | |||
| Equipment | Design housing performance evaluation report / Blueprints for new construction and renovation / Solar power generation system / Soil survey completed / Parking for two cars / Parking for three or more cars / LDK area of 20 tatami mats or more / Land area of 100 tsubo or more / Land area of 50 tsubo or more / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage in all rooms / Quiet residential area / Japanese-style room / Regular lot / Garden / Vanity with shower / Two toilets / Bathroom area of 1 tsubo or more / Two-story building / Southeast-facing / Double-glazed glass / Heated toilet seat / South garden / Window in bathroom / Open ceiling / Intercom with TV monitor / Good ventilation / Wood deck / Island kitchen / Pantry (storage for dishes and food) / Walk-in closet / Ceiling height of 2.5m or more / All rooms area of 6 tatami mats or more / Stairs in living room / City gas / Shoe storage / Located on high ground / Flat ground / Attic storage / Floor heating / Dishwasher / Low traffic volume in the area / Large distance between neighboring houses / Water purifier / High-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
68,990,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/11 | |||
| Important Notices | ○Takemura Elementary School / Ryujin Junior High School ※5.4kw solar power generation system installed (name change fee will be borne) ※We are not responsible for equipment breakdowns or malfunctions ※As is Law Article 22 Area, Outdoor Advertising, Urban Landscape Ordinance, Landscape Law, Specific Urban River Flood Damage Countermeasures Act |
|||||
|
|
||||||

