Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,978㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 32.9 million yen (4LDK) | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/9 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation certificate / Construction housing performance evaluation certificate (new construction) / BELS/Energy saving standard compliance certificate / Flat 35-S compliance certificate / Energy saving measures / Flat 35S compatible / Ground survey completed / Parking for 3 or more cars / Energy saving water heater / South facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / LDK over 15 tatami mats / Front road over 6m / Regular ground / Vanity with shower / Countertop kitchen / Barrier free / 2 toilets / Bathroom over 3.3 sq. m / 2-story / Double glazing / Auto bath / Heated toilet seat with washing machine / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Good ventilation / Flooring in all rooms / Walk-in closet / City gas / Shoe storage closet / Elementary school within 10 minutes' walk / Flat ground / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
32,900,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/11 | |||
| Important Notices | Restricted by Landscape Act, Article 22 area, residential land development construction restricted area, Toyohashi Ushikawa West Land Readjustment Project (provisional replacement land: 5 blocks, 10 plots), replacement land scheduled for March 2035, Agricultural Land Act, Urban Renaissance Special Measures Act |
|||||
|
|
||||||

