Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,480㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Linage Ama City Shippocho Kawa Room Landlord 1st Phase 1 Building Newly Built Detached House | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/12 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Compatible with Flat 35S / 2-car parking available / 18+ tatami mat living/dining/kitchen area / System kitchen / Storage in all rooms / South-facing road / Japanese-style room / Rectangular lot / Vanity with shower / Countertop kitchen / 2 toilets / 2-story building / Heated toilet seat / Window in bathroom / City gas / Dual-sided lighting in all rooms / IoT service "ID LINK" allows for various functions to be accessed via tablet or smartphone app. / Simultaneous cooking with a three-burner stove and grill is possible. / Large sink allows for thorough cleaning even in deep rooms. / Bathtub can be filled from the living room. / Remote-controlled toilet for a clean area around the toilet seat. / Easy-to-use sink. Wall-mounted faucet prevents limescale buildup. / A professional soil survey is conducted for each building before construction begins. Ground improvement work is also performed as necessary to ensure safety. / A slab foundation construction method is used for durability and resistance to uneven settlement. Foundation and reinforcement inspections are conducted in-house and by a third-party organization, and the condition of the reinforcement is strictly inspected. / Sufficiently strong and durable materials are used for the foundation, and standardized earthquake-resistant metal joints are used to join structural materials. / This is an important process to prevent leaks and condensation, which can corrode a home. / Frame-raising and metalwork inspections are conducted in-house and by a third-party organization, and pillars, beams, and metal joints are strictly inspected. After interior construction is complete, a carpentry completion inspection is conducted. / Fittings and home appliances are installed, and the construction is complete as a home. A completion inspection is conducted in-house, followed by a third-party completion inspection. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
26,900,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/20 | |||
| Important Notices | Article 22 area of the Act |
|||||
|
|
||||||


