Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,504㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 30,980,000 yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/9 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Energy-saving measures / highly airtight, highly insulated home / parking for 3 or more cars / immediate delivery available / access to 2 or more train lines / land area of 165m2 or more / delivery within the fiscal year / energy-saving water heater / proximity to city center / system kitchen / bathroom dryer / good sunlight / storage space in all rooms / flat to station / quiet residential area / living, dining, and kitchen area of 15 tatami mats or more / Japanese-style room / shaped lot / garden / vanity with shower / face-to-face kitchen / enhanced security / wide balcony / 2 toilets / bathroom area of 3.3m2 or more / 2-story / south-facing balcony / double-glazed windows / auto-bath / heated toilet seat / south-facing garden / underfloor storage space / bathroom window / intercom with TV monitor / water-saving toilet / lush residential area / urban suburbs / good ventilation / walk-in closet / induction cooking heater / double-glazed windows or double-glazed windows in all rooms / Shoe closet / Roof balcony / Flat ground / Dishwasher / Low traffic volume in the area / Wide spacing between neighboring houses / Well-maintained sidewalks / All-electric / Water purifier / Smart key / High-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
30,980,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/19 | |||
| Important Notices | Article 22 area of the Act |
|||||
|
|
||||||


