Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,355㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Newly built detached house, Hangetsucho 2-chome, Obu City ◆Building No. 4◆ | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK+S (storage room) | Year of construction | 2025/3 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Designed housing performance evaluation certificate / BELS/Energy saving standard compliance certificate / Flat 35S compatible / Solar power generation system / Soil survey completed / Delivery within the year / 2 parking spaces available / Immediate delivery available / Access to 2 or more train lines / LDK 18 tatami mats or more / Energy-saving water heater / Close to city center / South facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / South-facing road / Quiet residential area / Frontage road 6m or more / Regular lot / Vanity with shower / Countertop kitchen / Wide balcony / Lighting on 3 sides / 2 toilets / Bathroom 1 tsubo or more / 2-story / South-facing balcony / Double-glazed windows / Auto bath / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Lush residential area / Urban suburbs / Good ventilation / Flooring in all rooms / Great views / Pantry (storage for dishes and food) / Walk-in closet / Staircase in living room / Double-glazed or double-glazed windows in all rooms / City gas / Shoe closet / Two-sided lighting in all rooms / Storeroom / Dishwasher / Low traffic in the area / Water purifier / Smart key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
41,900,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/17 | |||
| Important Notices | Restrictions apply under the Erosion Control Act, restricted areas for residential land development work, Urban Renaissance Special Measures Act, notification required under the Agricultural Land Act, Article 22 areas and district planning areas, and the Act on Measures to Prevent Flooding of Specified Urban Rivers |
|||||
|
|
||||||


