Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,504㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 76.1 million yen to 81.9 million yen (3LDK+2S (storage room) / 3LDK+3S (storage room)) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK+2S (storage room) / 3LDK+3S (storage room) | Year of construction | 2024/8 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Long-term Excellent Housing Certification Notice / Energy-saving measures / Soil survey completed / Parking for 3 or more cars / LDK (living, dining, and kitchen) over 20 tatami mats / Land over 165 sq. m / Energy-saving water heater / Supermarket within 10 minutes' walk / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / South-facing road / Quiet residential area / Frontage road over 6m / Japanese-style room / Regular lot / Garden / Vanity with shower / Countertop kitchen / 2 toilets / 2-story building / South-facing balcony / Heated toilet seat / South garden / Underfloor storage / Window in bathroom / Open ceiling space / Intercom with TV monitor / Water-saving toilet / No front ridge / Good ventilation / Pantry (storage room for dishes and food) / Walk-in closet / Staircase in living room / Double-glazed glass or double-glazed sashes in all rooms / City gas / Shoe closet / Located on high ground / Elementary school Within 10 minutes' walk / Storage room / Dishwasher / Water purifier / Smart key / High-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
76,100,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/13 | |||
| Important Notices | High altitude area, green area ◎Completion date: Late August 2024 (Building 1), early March 2025 (Buildings 2 to 6) |
|||||
|
|
||||||

