Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,639㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 31.9 million yen (4LDK) | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/6 | |||
| Structure | Wooden structure (2 stories) | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation certificate / Construction housing performance evaluation certificate (new construction) / BELS/Energy Saving Standards Compliance Certificate / Flat 35-S Compliance Certificate / Energy saving measures / Flat 35S compatible / Airtight and highly insulated home / Ground survey completed / Parking for 3 or more cars available / Immediate delivery available / Delivery within the fiscal year available / Energy-saving water heater / Mountain view / Supermarket within 10 minutes' walk / South-facing / System kitchen / Good sunlight / Storage space in all rooms / Quiet residential area / LDK over 15 tatami mats / Front road over 6m wide / Regular lot / Garden / Vanity with shower / Countertop kitchen / Barrier-free access / 2 toilets / Bathroom over 3.3 sq. m / 2-story / South-facing balcony / Double-glazed windows / All rooms face south / Auto bath / Heated toilet seat / South-facing garden / Underfloor storage / Bathroom window / Intercom with TV monitor / Water-saving toilet / Good ventilation / Flooring in all rooms / Excellent views / Double-glazed or double-glazed windows in all rooms / City gas / Shoe closet / Two-sided lighting in all rooms / Flat ground / Movable partitions / Low traffic in the surrounding area / Water purifier / Smart key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
31,900,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/18 | |||
| Important Notices | Article 22 Areas, Measures to Prevent Flooding Damage to Specified Urban Rivers, Urban Renaissance Special Measures Act |
|||||
|
|
||||||


