Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,504㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 29.9 million yen to 30.9 million yen (3LDK+S (storage room)) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK+S (storage room) | Year of construction | 2025/12 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Eco-point eligible home / Flat 35S compatible / Soil survey completed / Delivery within the year / Parking for two cars / LDK 18 tatami mats or more / Energy-saving water heater / Supermarket within 10 minutes' walk / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Quiet residential area / General hospital within 10 minutes' walk / Front road 6m or more / Regular lot / Garden / Vanity with shower / Countertop kitchen / Wide balcony / Barrier-free / Two toilets / Bathroom 1 tsubo or more / Two-story / South-facing balcony / Double-glazed windows / Auto bath / Heated toilet seat / Southern garden / Underfloor storage / Window in bathroom / Intercom with TV monitor / Lush residential area / No front ridge / Good ventilation / Flooring in all rooms Pantry (storage for dishes and food) / City gas / Located on high ground / Elementary school within 10 minutes' walk / Low traffic volume in the area / Well-maintained sidewalks / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
29,900,000 Yen |
|||||
| Information publication date | 2025/11/12 | Next update date | 2025/11/13 | |||
| Important Notices | Restricted by the Sabo Act, residential land development work regulated area, special urban regeneration district, Article 22 area of the Act |
|||||
|
|
||||||

