Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,639㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 34.9 million yen to 38.5 million yen (3LDK to 3LDK+S (storage room)) | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK to 3LDK+S (storage room) | Year of construction | 2026/4 | |||
| Structure | Structure: Wooden Construction Method: Frame Construction Floors: 2 | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation / Construction Housing Performance Evaluation (new construction) / Flat 35-S Compliance Certificate / Flat 35S Compatible / Solar Power Generation System / Soil Survey Completed / Delivery within the Year / 2 Parking Spaces Available / LDK (Living, Dining, and Kitchen) 18 Tatami Mats or More / Delivery within the Year / Energy-Saving Water Heater / Supermarket within 10 Minutes' Walk / Close to City / South-Facing / System Kitchen / Bathroom Dryer / Good Sunlight / Storage Spaces in All Rooms / Frontage Road 6 Meters or More / Regular Lot / Vanity with Shower / Countertop Kitchen / EV Charging Station / Wide Balcony / Barrier-Free / 2 Toilets / Bathroom 1 Tsubo or Larger / 2-Story / South-Facing Balcony / Double-Glazed Glass / Auto Bath / Heated Toilet Seat / Open Ceiling / Intercom with TV Monitor / Urban Area / No Frontage Building / Good Ventilation / Flooring in All Rooms / Walk-in Closet Staircase in living room / City gas / Elementary school within 10 minutes walk / Roof balcony / Dishwasher / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
34,900,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/19 | |||
| Important Notices | Article 22 Area, Flood Control Act, Specific Urban River Flood Damage Countermeasures Act, Agricultural Land Act |
|||||
|
|
||||||


