Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 0㎜/ Year
National average precipitation: 0㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | First Town, Nagamaki Nakamichi, Daijicho, Kaifu County, 3 buildings in total, Building 3 | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/2 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Flat 35-S compliance certificate / Energy-saving measures / Flat 35-S compatible / Airtight, highly insulated home / Ground survey completed / Delivery within the year / 2 parking spaces available / Access to more than two train lines / Riverside / Energy-saving water heater / Mountain view / Close to city / Summer resort / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat to station / Quiet residential area / LDK (living, dining, kitchen) area of 15 tatami mats or more / Japanese-style room / Rural view / Garden / Vegetable garden / Vanity with shower / Countertop kitchen / Enhanced security / 2 toilets / Bathroom of 3.3m² or more / 2-story building / South-facing balcony / Double-glazed windows / Auto bath / Heated toilet seat / South-facing garden / Underfloor storage / Bathroom window / Intercom with TV monitor / Water-saving toilet / Lush residential area / Suburban location / Good ventilation / Walk-in closet / Double-glazed glass or double-glazed windows in all rooms / City gas / Dual-sided lighting in all rooms / Flat ground / Low traffic volume / Large spacing between neighboring houses / Water filter / High-performance toilet / [Rift Construction] The main components are constructed using engineered wood. Engineered wood, also known as laminated lumber, is a material that is less likely to bend or warp due to the sawn boards being dried in a factory with parallel grain. / [Structural Hardware Installation] Homes have shear walls that withstand earthquakes and wind. Each wall is fastened with hardware. Hardware is also installed to resist pull-out forces. / [Interim Inspection] Once the roof is completed and the structural hardware, shear walls, and waterproofing are installed, an interim inspection will be conducted. Similar to the foundation, specialized personnel and construction supervisors will inspect the building, as well as the legal inspection. / [Exterior Wall Construction] After the interim inspection is completed, the exterior wall construction will begin. We use a dry cement board called siding, which is produced in a factory and has excellent fire resistance and durability. / [Interior construction] At the same time, we also begin construction of the interior fittings. The walls and ceilings are made of a non-flammable material called gypsum board. / [Exterior construction] Once the exterior wall construction is complete, the exterior construction begins. We deliver the entire building, including the exterior construction. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
26,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/19 | |||
| Important Notices | Article 22 area of the Act |
|||||
|
|
||||||


