Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,639㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 36.8 million yen to 37.9 million yen (4LDK) | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/3 | |||
| Structure | Structure: Wooden Construction Method: Frame Construction Floors: 2 | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / BELS/Energy Saving Standards Compliance Certificate / Energy Saving Measures / Solar Power Generation System / Soil Survey Completed / Parking for 2 Cars / Access to 2 or More Train Lines / Land Area Over 165m2 / Delivery Within Fiscal Year / Energy-Saving Water Heater / Supermarket Within 10 Minutes' Walk / Close to City / South-Facing / System Kitchen / Bathroom Dryer / Good Sunlight / Storage Space in All Rooms / Quiet Residential Area / LDK Over 15 Tatami Mats / Front Road Over 6m / Regular Lot / Garden / Vanity with Shower / Countertop Kitchen / EV Charging Station / Barrier-Free / 2 Toilets / 2-Story / South-Facing Balcony / Double-Glazed Windows / Auto Bath / Heated Toilet Seat / South-Facing Garden / Underfloor Storage / Intercom with TV Monitor / Urban Location / No Front Building / Good Ventilation / Flooring in All Rooms / Pantry (Storage for Dishes and Food) Walk-in closet / double-glazed or double-glazed windows in all rooms / city gas / shoe closet / two-sided lighting in all rooms / within 10 minutes' walk of elementary school / roof balcony / dishwasher / water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
36,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/19 | |||
| Important Notices | Article 22 of the Building Standards Act, Specific Urban River Flood Damage Countermeasures Act |
|||||
|
|
||||||


