Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,639㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Ichinomiya City Shimonumacho Newly built detached house | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 2LDK+S (storage room) | Year of construction | 2026/2 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Design Housing Performance Evaluation Report / Construction Housing Performance Evaluation Report (New Construction) / Compatible with Flat 35S / Parking for 3 or more cars / Delivery within the fiscal year / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / LDK (living, dining, and kitchen) area of 15 tatami mats or more / Open-plan kitchen / Two toilets / Two-story building / Double-glazed windows / South-facing rooms / Heated toilet seat / Underfloor storage / Bathroom window / Intercom with TV monitor / Good ventilation / Walk-in closet / City gas / Other facilities / Other facilities / Other facilities / Other facilities / Other facilities / Other facilities / Other facilities / We conduct ground surveys (Swedish-style sounding surveys) at all sites, and if the results do not meet our standards, we perform ground improvement work. / This is a very important project, and without a solid foundation, no high-performance home is worth anything. Construction supervisors and specialists conduct inspections. / The main components are constructed of engineered wood. Engineered wood is a material that is less likely to bend or warp due to the fact that laminated lumber is dried in a factory and the fibers are parallel. / Homes have walls called shear walls that can withstand earthquakes and wind forces. Each wall is fastened using metal fittings, and metal fittings that resist pulling forces are also attached to these walls. / Once the roof is completed and construction of the structural metal fittings, shear walls, waterproofing, etc. is complete, an intermediate inspection takes place. After the inspection, dry-laid cement boards called siding are attached to the exterior walls. / Exterior and interior construction work proceeds simultaneously, and exterior construction begins after the exterior wall work is completed. At our company, the building is handed over as a single unit after the exterior construction work is complete. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
30,900,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/20 | |||
| Important Notices | ||||||
|
|
||||||


