Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,978㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | TOYO D-style Agatsumacho Building 1 | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/11 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Design Housing Performance Evaluation Report / Construction Housing Performance Evaluation Report (New Construction) / Flat 35-S Compliance Certificate / Flat 35S Compatible / Soil Survey Completed / Parking for 2 Cars / Energy-Saving Water Heater / Supermarket within 10 Minutes' Walk / System Kitchen / Bathroom Dryer / Quiet Residential Area / LDK (Living, Dining, and Kitchen) 15+ Tatami Mats / Japanese-Style Room / Regular Lot / EV Charging Station / Barrier-Free / 2 Toilets / Bathroom 1 Tsubo (3.3 m2) or Larger / 2-Story / South-Facing Balcony / Double-Glazed Glass / Heated Toilet Seat / Underfloor Storage / Window in Bathroom / Intercom with TV Monitor / Good Ventilation / All Rooms Have Natural Light from Two Sides / All Rooms Face Southwest / Dishwasher / Water Purifier / If there are multiple units for sale, this label indicates the performance of a specific unit and not all units. / If you have the remote key, you can lock and unlock the door by simply pressing the button on the door handle. / It has insulating properties that prevent indoor warmth and coolness from escaping, while also blocking the inflow of heat from the sun and glare, thereby reducing the heat inside the room. / Easily charge your EV from the comfort of your own home | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
35,480,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/15 | |||
| Important Notices | Semi-fire prevention area |
|||||
|
|
||||||


