Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,978㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 24.8 million yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/9 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation Report / Construction Housing Performance Evaluation Report (new construction) / Compatible with Flat 35S / Soil Survey Completed / Parking for 3 or more cars available / Immediate Delivery Available / Access to 2 or more train lines / LDK (living, dining, kitchen, and kitchen) 18 tatami mats or larger / Energy-saving water heater / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / South-facing road / Quiet residential area / Frontage road 6m or wider / Vanity with shower / Countertop kitchen / Lighting on 3 sides / Barrier-free / 2 toilets / Bathroom 1 tsubo or larger / 2-story / Double-glazed windows / Auto bath / Heated toilet seat / South garden / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Good ventilation / Flooring in all rooms / Pantry (storage for dishes and food) / Walk-in closet / Staircase in living room / Lighting on 2 sides in all rooms / Elementary school within 10 minutes walk / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
24,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/20 | |||
| Important Notices | *There may be utility poles and guy wires within the residential area. *A judicial scrivener must be appointed. *Urban planning road (30m) *Long-term quality housing |
|||||
|
|
||||||


