Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,355㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 一戸建て【 高浜市春日町4丁目 】キャンペーン対象物件◎ | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2018/6 | |||
| Structure | Two-story wooden building (frame construction) with some steel frame | Format | Used detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Energy-saving measures / Soil survey completed / Delivery within the year / Parking for 3 or more cars available / Access to 2 or more train lines / Energy-saving water heater / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage in all rooms / Quiet residential area / LDK (living, dining, and kitchen) 15 tatami mats or more / Japanese-style room / Vanity with shower / Countertop kitchen / Wide balcony / Barrier-free / 2 toilets / Bathroom 1 tsubo or more / 2-story / South-facing balcony / Double-glazed windows / Auto bath / Heated toilet seat with washing function / Underfloor storage / Window in bathroom / Open ceiling space / Intercom with TV monitor / Water-saving toilet / No front ridge / Good ventilation / Great views / Pantry (storage for dishes and food) / Walk-in closet / IH cooking heater / Shoe closet / All rooms have two-sided lighting / BS, CS, CATV / Elementary school within 10 minutes' walk / Roof balcony / Flat ground / Dishwasher / Well-maintained sidewalks / All-electric / Water purifier / Smart key / High-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
30,800,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/13 | |||
| Important Notices | Setback: Completed, Building Standards Act Article 22 Area |
|||||
|
|
||||||


