Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,355㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 35.8 million yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/8 | |||
| Structure | Two-story wooden building (frame construction) | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation / Construction Housing Performance Evaluation (new construction) / Flat 35-S Compliance Certificate / Energy-Saving Measures / Soil Survey Completed / Parking for 2 Cars / Immediate Delivery Available / Land Area Over 165 sq. m / Energy-Saving Water Heater / Close to City / South-Facing / System Kitchen / Bathroom Dryer / Good Sunlight / Storage Spaces in All Rooms / Flat to Station / South-Facing Road / Living/Dining/Kitchen Area Over 15 Tatami Mats / Frontage Road Over 6 Meters / Regular Lot / Vanity with Shower / Countertop Kitchen / Enhanced Security / Wide Balcony / Two Toilets / Bathroom Over 3.5 sq. m / Two-Story / South-Facing Balcony / Double-Glazed Glass / Auto Bath / Heated Toilet Seat / Underfloor Storage / Window in Bathroom / Intercom with TV Monitor / Water-Saving Toilet / Good Ventilation / Flooring in All Rooms / Walk-in Closet / All rooms have double-glazed windows or double-glazed sashes / City gas / Flat ground / Low traffic volume in the surrounding area / Water purifier / High-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
35,800,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/21 | |||
| Important Notices | Restricted by the River Act, residential land development construction restricted area, Article 22 area |
|||||
|
|
||||||


