Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,978㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 22.8 million yen (5LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 5LDK | Year of construction | 2025/12 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Assessment / Construction Housing Performance Assessment (new construction) / Energy-saving measures / Soil survey completed / Delivery within the year / 2 parking spaces available / Immediate delivery available / Access to two or more train lines / Land area over 165 sq. m / Energy-saving water heater / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat to station / Quiet residential area / LDK over 15 tatami mats / Regular lot / Rural landscape / Garden / Vanity with shower / Countertop kitchen / Wide balcony / Barrier-free / Two toilets / Bathroom over 3.5 sq. m / Two-story building / South-facing balcony / Double-glazed windows / Auto bath / Heated toilet seat with washing machine / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Good ventilation / Flooring in all rooms / Walk-in closet / Stairs in living room / All rooms have double-glazed glass or double-glazed sashes / Flat ground / Low traffic volume in the surrounding area / Well-maintained sidewalks / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
22,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/17 | |||
| Important Notices | Residential land development construction restricted area, *Designated area under Article 22 of the Building Standards Act, Long-lasting quality housing, Designed housing performance evaluation certificate, Construction housing performance evaluation certificate (for new construction) *Parking available for 2 cars (depending on vehicle type) |
|||||
|
|
||||||


