Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,355㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Proud Obu | Number of floors | 12階 floor (15floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK+S (storage room) | Year of construction | 2023/9 | |||
| Structure | RC 15-story building | Format | Used apartments | |||
| Equipment | Energy-saving measures / Access to two or more train lines / Delivery within the fiscal year / Supermarket within 10 minutes' walk / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Ample shared facilities / Storage in all rooms / Flat to station / Quiet residential area / LDK (living, dining, and kitchen) over 15 tatami mats / High floor / Garden over 10 tsubo / Guest room / Vanity with shower / Countertop kitchen / 24-hour trash disposal / Enhanced security / Wide balcony / Bathroom over 33 tsubo / Balcony on two or more sides / South-facing balcony / Double-glazed bathroom / Auto-bath / Heated toilet seat / Intercom with TV monitor / Lush residential area / Good ventilation / Hardwood floors in all rooms / Great views / Pantry (storage for dishes and food) / Walk-in closet / Double-glazed or double-glazed windows in all rooms / Pets allowed / Elementary school within 10 minutes' walk / Fireworks viewing / Flat ground / Floor heating / elevator / delivery locker / bicycle parking space / kids' room/daycare center / storage room / dishwasher / motorcycle parking space / low traffic volume in the area / well-maintained sidewalks / garbage disposer (food waste grinder) / high-performance toilets | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
53,813,030 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/18 | |||
| Important Notices | Article 22 area of the Act |
|||||
|
|
||||||


