Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 0㎜/ Year
National average precipitation: 0㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 37.8 million yen (5LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 5LDK | Year of construction | 2026/4 | |||
| Structure | Two-story wooden building (frame construction) with some wooden construction | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation Report / Construction Housing Performance Evaluation Report (new construction) / Flat 35-S Compliance Certificate / Energy-Saving Measures / Highly Airtight and Insulated Home / Soil Survey Completed / Parking for 2 Cars / Access to 2 or More Train Lines / Energy-Saving Water Heater / Mountain View / Close to City / South-Facing / System Kitchen / Bathroom Dryer / Good Sunlight / Storage Spaces in All Rooms / Flat to Station / Quiet Residential Area / LDK (Living, Dining, and Kitchen) 15+ Tatami Mats / Regular Lot / Rural View / Vanity with Shower / Countertop Kitchen / Enhanced Security / Wide Balcony / 2 Toilets / Bathroom 1 Tsubo or Larger / 2-Story / South-Facing Balcony / Double-Glazed Glass / Underfloor Storage / Window in Bathroom / Intercom with TV Monitor / Water-Saving Toilet / Lush Residential Area / Urban Suburb / No Front Building / Good Ventilation / Flooring in All Rooms / Great Views Walk-in closet / double-glazed or double-glazed windows in all rooms / two-sided lighting in all rooms / roof balcony / flat ground / low traffic volume in the area / large spacing between neighboring houses / water purifier / high-performance toilet | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
37,800,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/21 | |||
| Important Notices | Residential land development work regulation area, Housing land development work regulation area Law Article 22 area |
|||||
|
|
||||||


