Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,870㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 31.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2026/2 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Designed Housing Performance Evaluation Report / Flat 35-S Compliance Certificate / Energy-Saving Measures / Compatible with Flat 35S / Soil Survey Completed / Parking for 2 Cars / Access to 2 or More Train Lines / LDK (Living, Dining, Dining, and Kitchen) 18 Tatami Mats or More / Delivery Within Fiscal Year / Energy-Saving Water Heater / Close to City / South-Facing / System Kitchen / Bathroom Dryer / Good Sunlight / Storage Spaces in All Rooms / Frontage Road 6m or More / Corner Lot / Regular Lot / Garden / Vanity with Shower / Countertop Kitchen / Wide Balcony / Lighting on 3 Sides / Barrier-Free / 2 Toilets / Bathrooms 1 Tsubo or Larger / 2-Story / South-Facing Balcony / Double-Glazed Glass / Auto Bath / Heated Toilet Seat / Underfloor Storage / Window in Bathroom / Open Ceiling Light / Intercom with TV Monitor / Water-Saving Toilet / Urban Location / No Front Building / Good Ventilation / Flooring in All Rooms Pantry (storage for dishes and food) / double-glazed glass or double-glazed sashes in all rooms / city gas / shoe closet / two-sided lighting in all rooms / roof balcony / dishwasher / water purifier / smart key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
31,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/19 | |||
| Important Notices | Article 22 Areas, Law Concerning the Regulation of Land Development and Specific Embankments, Law Concerning the Measures for Flooding Damage of Specific Urban Rivers |
|||||
|
|
||||||


