Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,978㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 29.9 million yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/1 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Assessment / Construction Housing Performance Assessment (new construction) / Compatible with Flat 35S / Soil Survey Completed / Parking for 2 cars / Access to 2 or more train lines / Land area of 165m2 or larger / Energy-efficient water heater / Supermarket within 10 minutes' walk / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / South-facing road / Quiet residential area / LDK area of 15 tatami mats or larger / Front road 6m or larger / Garden / Vanity with shower / Countertop kitchen / Lighting from 3 sides / Barrier-free / 2 toilets / Bathroom 3.3m2 or larger / 2-story / Double-glazed / All rooms face south / Auto-bath / Heated toilet seat / South-facing garden / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Good ventilation / Flooring in all rooms / Walk-in closet / Elementary school Within 10 minutes walk / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
29,900,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/21 | |||
| Important Notices | Area where residential land development work is restricted, *Within urban planning area, Article 22 area, sewage treatment area, area where residential land development work etc. is restricted *Long-term quality housing *A right-of-way easement is required for the passage between buildings 2 and 3. |
|||||
|
|
||||||


