Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 0㎜/ Year
National average precipitation: 0㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | First Town Ojicho Nagamakiyu 2nd Building, 4 buildings total, Building 3 | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/6 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Parking for 3 or more cars / System kitchen / Storage in all rooms / LDK (living, dining, and kitchen) over 15 tatami mats / Japanese-style room / Rectangular lot / Vanity with shower / Countertop kitchen / Two toilets / Two-story building / Double-glazed windows / Auto bath / Heated toilet seat / Intercom with TV monitor / Walk-in closet / City gas / Three-burner gas stove for multiple cooking options / Wide sink for easy cleaning / Easy-to-read hot water heater panel with simple markings / Easy-to-clean bathroom sink / Restrooms on both floors for peace of mind during busy times / Intercom with monitor for checking the caller's face / We conduct ground surveys (Swedish-style sounding surveys) at all sites, and if the survey results do not meet our standards, we implement ground improvement work. / This is a very important project, and no high-performance home is worthless without a solid foundation. Construction supervisors and specialists inspect the project. / The main components are constructed of engineered wood. Engineered wood is a material that is less likely to bend or warp due to the fact that laminated lumber is dried in a factory and the fibers are parallel. / Homes have walls called shear walls that can withstand earthquakes and wind forces. Each wall is fastened using metal fittings, and metal fittings that resist pulling forces are also attached to these walls. / Once the roof is completed and construction of the structural metal fittings, shear walls, waterproofing, etc. is complete, an intermediate inspection takes place. After the inspection, dry-laid cement boards called siding are attached to the exterior walls. / Exterior and interior construction work proceeds simultaneously, and exterior construction begins after the exterior wall work is completed. At our company, the building is handed over as a single unit after the exterior construction work is complete. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
26,800,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/14 | |||
| Important Notices | ||||||
|
|
||||||

