Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,454㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 53.9 million yen (4LDK) | Number of floors | floor (3floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2025/12 | |||
| Structure | Three-story wooden building | Format | Newly built detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (new construction) / Flat 35-S compliance certificate / Energy-saving measures / Compatible with Flat 35S / Soil survey completed / Delivery within the year / Access to two or more train lines / LDK 18 tatami mats or more / Delivery within the fiscal year / Energy-saving water heater / Supermarket within 10 minutes' walk / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat to station / Quiet residential area / General hospital within 10 minutes' walk / Front road 6 meters or more / Corner lot / First stop station / Regular lot / Garden / Vanity with shower / Countertop kitchen / Enhanced security / Barrier-free / Two toilets / Bathroom 1 tsubo or larger / South-facing balcony / Double-glazed windows / Auto bath / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Lush residential area / suburban area / good ventilation / pantry (storage for dishes and food) / 3+ floors / city gas / all rooms have natural lighting on two sides / flat ground / storage room / dishwasher / low traffic in the area / water purifier / built-in garage | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
53,900,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/26 | |||
| Important Notices | ||||||
|
|
||||||

