Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,454㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Finally the last one! 14 minutes walk from Sobudai-mae. 7 custom-built, energy-efficient design homes. | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | Year of construction | / | ||||
| Structure | Format | Newly built detached house | ||||
| Equipment | Design Housing Performance Assessment / Construction Housing Performance Assessment (new construction) / Flat 35-S Compliance Certificate / Flat 35S Compatible / Delivery within the year / Two parking spaces available / Immediate delivery available / Good sunlight / Flat to station / 15+ tatami mat living/dining/kitchen area / Regular lot / Vanity with shower / Two toilets / Two-story building / Heated toilet seat / Underfloor storage / Intercom with TV monitor / Water-saving toilet / Lush residential area / Good ventilation / Hardwood flooring in all rooms / City gas / Elementary school within 10 minutes' walk / Flat lot / Located in a developed subdivision / High-performance toilet / Ground surveys are conducted before construction begins after the floor plan is finalized, and ground improvement work is carried out if necessary. Safety and security are guaranteed here. / Earthquake-resistant slab foundation with surface support. The foundation width of 150mm, thicker than the standard 120mm, ensures a more earthquake-resistant home. / These components support the first floor and have a solid load-bearing capacity. Rotting the floor beams themselves is pointless. After construction, gaps caused by shrinkage of the joists due to drying can be easily adjusted later. / By insulating the foundation from the base, damage from rot and termites is prevented, ensuring the building's durability and the performance of the building materials are fully utilized. Long base packing allows natural air to flow from the entire perimeter of the foundation into the space under the floor. / After the framing is completed, a chemical that is resistant to termites is applied to a height of approximately 1.5 meters, and the construction comes with a 5-year warranty. / We also offer a reliable after-sales service guarantee. Please ask our staff for details. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent | ||||||
| Information publication date | 2026/1/15 | Next update date | ||||
| Important Notices | ||||||
|
|
||||||


