Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,282㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 57.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2020/1 | |||
| Structure | Two-story wooden building | Format | Used detached house | |||
| Equipment | Building inspection completed / 2 parking spaces available / Access to two or more train lines / LDK (living, dining, and kitchen) over 18 tatami mats / Supermarket within 10 minutes' walk / Close to city center / System kitchen / Good sunlight / Storage space in all rooms / Flat to station / Quiet residential area / Frontage over 6m / Corner lot / Regular lot / Garden / Vanity with shower / Countertop kitchen / High-roof parking / Lighting on three sides / Bathroom over 3.3 sq. m / 2-story / Southeast facing / Double-glazed windows / Auto bath / Heated toilet seat / Loft / South garden / Underfloor storage / Window in bathroom / Open ceiling / Intercom with TV monitor / Near city / Good ventilation / Wood flooring in all rooms / Wood deck / Ceiling height over 2.5m / IH cooking heater / Stairs in living room / Double-glazed windows or double-glazed windows in all rooms / Lighting on two sides in all rooms / Elementary school within 10 minutes' walk Flat land / Dishwasher / Low traffic volume / Large distance between neighboring houses | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
57,800,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/28 | |||
| Important Notices | There are restrictions under the Landscape Act, residential land development work is restricted in this area, there are maximum height limits, minimum lot area limits, and shadow restrictions. When rebuilding, measures such as deep foundations, foundation piles, repairing/reconstructing retaining walls, and setting back exterior walls may be required. |
|||||
|
|
||||||


