Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 75 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2018/5 | |||
| Structure | Two-story wooden building | Format | Used detached house | |||
| Equipment | Building inspection completed / 2 parking spaces available / LDK (living, dining, and kitchen) over 20 tatami mats / close to city center / south-facing / system kitchen / bathroom dryer / good sunlight / storage space in all rooms / flat surface to station / quiet residential area / garden / vanity with shower / face-to-face kitchen / lighting on three sides / 2 toilets / bathroom over 3.3 sq. m / 2-story / south-facing balcony / double-glazed bathroom / auto-bath / heated toilet seat / loft / underfloor storage / window in bathroom / intercom with TV monitor / near city / good ventilation / flooring in all rooms / island kitchen / pantry (storage for dishes and food) / induction cooking heater / staircase in living room / double-glazed or double-glazed sash windows in all rooms / city gas / dishwasher / low traffic in the area / water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
75,000,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/27 | |||
| Important Notices | Restrictions apply under the Landscape Act, residential land development construction restricted area, steep slope collapse risk area, quasi-fire prevention area, scenic area, maximum height limit, shadow restrictions, wall setback, green area, landslide warning area, when rebuilding, measures such as deep foundations, foundation piles, repair/reconstruction of retaining walls, exterior wall setback, etc. may be required. |
|||||
|
|
||||||


