Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 62.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2026/6 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Energy-saving measures / Compatible with Flat 35S / Soil survey completed / Access to two or more train lines / Energy-saving water heater / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat to station / South-facing road / Quiet residential area / LDK (living, dining, and kitchen) 15 tatami mats or more / Regular lot / Vanity with shower / Countertop kitchen / Enhanced security / Wide balcony / Lighting on three sides / Two toilets / Bathroom 1 tsubo or more / Two-story / South-facing balcony / Double-glazed bathroom / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Near city / No building in front / Good ventilation / Flooring in all rooms / Great views / Double-glazed glass or double-glazed sashes in all rooms / Shoe storage closet / Lighting on two sides in all rooms / Within a 10-minute walk of elementary school / Flat ground / Attic storage / Dishwasher / Low traffic volume / Large distance between neighboring houses / Water purifier / Smart key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
62,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/25 | |||
| Important Notices | Restrictions apply under the Landscape Act, residential land development restrictions apply, semi-fire prevention area, minimum site area requirements apply, shadow restrictions apply |
|||||
|
|
||||||


