Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 61.8 million yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/1 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Supermarket within 10 minutes' walk / South facing / System kitchen / Bathroom dryer / Good sunlight / Storage in all rooms / South facing road / Quiet residential area / LDK 15 tatami mats or more / Form-fitted lot / Vanity with shower / Countertop kitchen / High roof parking / 2 toilets / 2-story / South-facing balcony / Auto bath / Heated toilet seat / Window in bathroom / Intercom with TV monitor / Good ventilation / Flooring in all rooms / Island kitchen / Elementary school within 10 minutes' walk / Dishwasher / Low traffic in the area / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
61,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/26 | |||
| Important Notices | There are restrictions under the Landscape Act, residential land development restriction area, height district, quasi-fire prevention area, maximum height limit, minimum lot area, shadow restrictions, building restrictions as it is on a cliff, there are steps on the property, there are steps between the road and the property, and as there is a difference in elevation between this property and the neighboring land, there is a retaining wall to support the difference. When rebuilding or renovating, you may receive instructions from a specific administrative agency to reinforce or rebuild the retaining wall, or set back the exterior wall of the building. The costs of these measures will be borne by the buyer. |
|||||
|
|
||||||


