Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 47.8 million yen / 50.8 million yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/4 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Compatible with Flat 35S / Accessible to more than two train lines / Supermarket within 10 minutes' walk / System kitchen / Bathroom dryer / Storage in all rooms / Quiet residential area / LDK over 15 tatami mats / Vanity with shower / Countertop kitchen / Two toilets / Two-story building / Balconies on more than two sides / Double-glazed glass / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Lush residential area / City gas / Roof balcony / Dishwasher / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
47,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/19 | |||
| Important Notices | Residential land development construction restriction area, height district, maximum height limit, minimum lot area, shadow restrictions, building restrictions below cliff, building restrictions above cliff, some agreed passageways, irregular land, steps within site, wall setback, Building Standards Act Article 22 area, includes sloping land Yokohama lifestyle convenience-inducing low-rise residential area Kamisugata District Urban Development Plan *When constructing or rebuilding a building, measures such as deep foundations, foundation piles, repair/reconstruction of retaining walls, and exterior wall setback may be required When constructing or rebuilding a building, measures such as installation of protective walls, high foundations, and exterior wall setback may be required Building area includes penthouse area (Building A 4.14 sqm, Building B 3.72 sqm) |
|||||
|
|
||||||


