Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 69,980,000 yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2017/9 | |||
| Structure | Two-story wooden building | Format | Used detached house | |||
| Equipment | Available for immediate delivery / Access to two or more train lines / Supermarket within 10 minutes' walk / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / South-facing road / Quiet residential area / LDK (living, dining, and kitchen) over 15 tatami mats / General hospital within 10 minutes' walk / Lot / Garden / Countertop kitchen / High-roof parking / Barrier-free / Two toilets / Bathroom over 3.3 sq. m / Two-story building / South-facing balcony / Double-glazed windows / South-facing toilet seat / Heated toilet seat / South-facing garden / Underfloor storage / Bathroom window / Intercom with TV monitor / Urban area / Good ventilation / Wood flooring in all rooms / Wood deck / Great views / Staircase in living room / Double-glazed windows or double-glazed windows in all rooms / City gas / Shoe closet / Located on high ground / Elementary school within 10 minutes' walk / Underfloor heating / Dishwasher / water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
69,980,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/27 | |||
| Important Notices | Setback: 4.95m2 required, restricted by Landscape Act, residential land development construction restricted area, height district, maximum height limit, minimum lot area, shadow restrictions, wall setback, SB may be required when rebuilding. Also, redoing walls etc. may be required. |
|||||
|
|
||||||

