Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | ~A family-friendly space has been created here, with the themes of "brightness," "size," and "storage capacity"~ | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/1 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | BELS/Energy Saving Standards Certified / Parking for 2 cars / LDK (over 20 tatami mats) / Land area over 165 sq. m / Supermarket within 10 minutes' walk / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Quiet residential area / Frontage over 6m / Vanity with shower / Countertop kitchen / 2 toilets / Bathroom over 3.5 sq. m / 2-story / South-facing balcony / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Good ventilation / Hardwood floors in all rooms / Walk-in closet / Stairs in living room / City gas / Elementary school within 10 minutes' walk / Underfloor heating / Dishwasher / Water purifier / 2 side-by-side car spaces for peace of mind when guests come over / Underfloor heating for warmth in winter / Dishwasher that saves time on housework and is gentle on the skin / Walk-in closet for neatly storing lots of clothes Comes with a bathroom dryer so you can dry your laundry even on rainy days. / An intercom with a TV monitor is also included for security. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
89,990,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/15 | |||
| Important Notices | Restrictions apply under the Landscape Act, residential land development construction restrictions, height district, maximum height limit, shadow restrictions, steps within the site, wall setback, green area |
|||||
|
|
||||||


