Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 49,990,000 yen (2LDK+S (storage room)) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 2LDK+S (storage room) | Year of construction | 2025/12 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Ground survey completed / Access to two or more train lines / LDK (living, dining, and kitchen) over 18 tatami mats / Delivery within the fiscal year / Supermarket within 10 minutes' walk / Close to city center / System kitchen / Bathroom dryer / Good sunlight / Storage in all rooms / Quiet residential area / Shower vanity / Countertop kitchen / Lighting on three sides / Two toilets / Bathroom over 3.3 sq. m / Two-story / Double-glazed / Auto bath / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Near city / Good ventilation / Flooring in all rooms / Stairs in living room / Double-glazed or double-glazed windows in all rooms / City gas / Lighting on two sides in all rooms / Elementary school within 10 minutes' walk / Flat ground / Underfloor heating / Storage room / Dishwasher / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
49,990,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/26 | |||
| Important Notices | Setback: Completed, Restrictions apply under the Cultural Properties Protection Act, Restrictions apply under the Landscape Act, Residential Land Development Restrictions Area, Maximum Height Limit, Minimum Lot Area Limit, Shadow Restrictions Apply, Irregular Land, Green Zone, When rebuilding, measures such as deep foundations, foundation piles, repair/reconstruction of retaining walls, and exterior wall setback may be required. Some blocks and plants from the neighboring land to the west cross over into the boundary. |
|||||
|
|
||||||

