Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 53.8 million yen/59.8 million yen (4LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/4 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Access to more than two train lines / LDK (living, dining, and kitchen) of 18 tatami mats or more / Supermarket within 10 minutes' walk / System kitchen / Good sunlight / Storage in all rooms / Quiet residential area / Bathroom vanity with shower / Countertop kitchen / Wide balcony / Two toilets / Two-story building / South-facing balcony / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Lush residential area / Pantry (storage for dishes and food) / Staircase in living room / City gas / Shoe cloakroom / All rooms have natural lighting on two sides / Elementary school within 10 minutes' walk / Roof balcony | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
53,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/19 | |||
| Important Notices | Residential land development restriction area, high-rise district, quasi-fire prevention area, shadow restrictions, building restrictions below cliff, building restrictions on cliff, irregular land, steps within site, Building Standards Act Article 22 area, sloping land When constructing or rebuilding a building, measures such as deep foundations, foundation piles, repair/reconstruction of retaining walls, and exterior wall setback may be required When constructing or rebuilding a building, measures such as installing protective walls, high foundations, and exterior wall setback may be required. |
|||||
|
|
||||||

