Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,352㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 44.8 million yen (5LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 5LDK | Year of construction | 2001/7 | |||
| Structure | Two-story wooden building | Format | Used detached house | |||
| Equipment | Energy-saving measures / solar power generation system / 2 parking spaces available / access to more than two train lines / energy-saving water heater / interior and exterior renovations / south-facing / system kitchen / bathroom dryer / good sunlight / storage space in all rooms / quiet residential area / frontage road over 6m / shaped lot / garden / vanity with shower / 2 toilets / bathroom over 3.3 sq. m / 2-story / balconies on more than two sides / double-glazed windows / auto-bath / heated toilet seat / underfloor storage / window in bathroom / intercom with TV monitor / lush residential area / good ventilation / flooring in all rooms / wood deck / induction cooking heater / double-glazed windows or double-glazed sashes in all rooms / city gas / underfloor heating / well-maintained sidewalks / water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
44,800,000 Yen |
|||||
| Information publication date | 2026/1/17 | Next update date | 2026/1/27 | |||
| Important Notices | [Height district] Type 1 height district [Fire prevention area] Not designated [Planned road] None [Land readjustment] None [Parking] Available (can park 2 cars depending on the type of vehicle) [Height district] Type 1 height district [Renovation history] *Completed in November 2014: Solar panel (photovoltaic power generation system) installation, roof and exterior wall repair, wood deck installation, water heater replacement (EcoCute), induction cooking heater *Completed in August 2018: Wood deck fence installation *Completed in November 2018: Toilet replacement, toilet floor replacement *Completed in February 2025: 1st floor wallpaper replacement, bathroom floor replacement, Japanese-style room tatami replacement [Current status] Currently occupied [Other] Disclaimer of non-compliance with contract |
|||||
|
|
||||||


