Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,250㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | [Sumitomo Realty & Development's residential development] J Urban Hachioji 5th Phase | Number of floors | floor (floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | Year of construction | / | ||||
| Structure | Format | Newly built detached house | ||||
| Equipment | Accessible to two or more train lines / Vacant lot available / Supermarket within 10 minutes' walk / Flat ground to station / Quiet residential area / General hospital within 10 minutes' walk / Starting station / Flat ground / City gas / Flat ground / Redeveloped land / Well-maintained sidewalks | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
49,000,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/10 | |||
| Important Notices | This land is subject to the Landscape Act, is in a residential land development restricted area, and is a quasi-fire prevention area. [Land with construction conditions] This land is sold on the condition that a construction contract for a home is concluded with Sumitomo Real Estate Housing Co., Ltd. within three months of the land purchase contract. After the purchase contract is signed, you will be required to discuss the architectural design. If the construction contract is not concluded within three months, the land purchase contract will be null and void, and we will promptly and unconditionally refund the full land price (including the application deposit and deposit). The purchaser must restore the land to its original condition and hand it over to us. *Of the 117.23m2 lot area of Lot No. 4, approximately 28% is an alley-like area. * After delivery, construction work within this residential area may cause noise, vibrations, odors, dust, etc., and you may be affected by construction vehicles. |
|||||
|
|
||||||

