Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,296㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 58.48 million yen/59.98 million yen (3LDK: Building 1/+WIC, loft) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK: Building 1/+WIC, loft | Year of construction | 2025/11 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Energy-saving measures / highly airtight and insulated home / soil survey completed / two parking spaces available / access to two or more train lines / energy-saving water heater / close to city center / system kitchen / bathroom dryer / good sunlight / quiet residential area / LDK (living, dining, and kitchen) 15 tatami mats or more / within a 10-minute walk of a general hospital / corner lot / vegetable garden / vanity with shower / face-to-face kitchen / three-sided lighting / barrier-free / two toilets / bathroom 1 tsubo or larger / two-story / double-glazed home / auto-bath / heated toilet seat / loft / underfloor storage / window in bathroom / intercom with TV monitor / water-saving toilet / lush residential area / good ventilation / flooring in all rooms / great views / walk-in closet / double-glazed or double-glazed sashes in all rooms / city gas / two-sided lighting in all rooms / within a 10-minute walk of an elementary school / flat ground / Dishwasher/Dryer / Low traffic volume in the area / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
58,480,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/23 | |||
| Important Notices | Buried cultural property site Cultural Properties Protection Law Landscape Ordinance (Mitaka City Landscape Creation) Building coverage ratio relaxed to 60%, land area includes approximately 0.5 square meters of corner cut (Building No. 2) |
|||||
|
|
||||||


