Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,178㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | Nakahara 2-chome. Newly built detached house certified as a long-term quality home. Completed! Viewing available. | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2025/12 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation Report / Construction Housing Performance Evaluation Report (new construction) / Compatible with Flat 35S / 2 parking spaces available / Immediate delivery available / LDK (living, dining, and kitchen) over 18 tatami mats / Near tennis court / Supermarket within 10 minutes' walk / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat to station / South-facing road / Quiet residential area / Frontage over 6m / Vanity with shower / Countertop kitchen / Barrier-free / 2 toilets / Bathroom over 3.3 sq. m / 2-story / South-facing balcony / Double-glazed bath / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Lush residential area / Good ventilation / Flooring in all rooms / Walk-in closet / Stairs in living room / Double-glazed or double-glazed sashes in all rooms / City gas / Shoe closet / All rooms have two-sided lighting / Elementary school within 10 minutes' walk / Flat ground / Low traffic volume in the surrounding area / Water purifier / Smart key | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
38,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/16 | |||
| Important Notices | Restrictions apply under the Landscape Act, restrictions apply under the Aviation Act, height districts, semi-fire prevention areas, maximum height limits, minimum lot area limits, and shadow restrictions. |
|||||
|
|
||||||

