Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,178㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 44.8 million yen (3LDK) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK | Year of construction | 2007/5 | |||
| Structure | Two-story wooden building | Format | Used detached house | |||
| Equipment | Design housing performance evaluation report / Construction housing performance evaluation report (for new construction) / Building confirmation completion inspection certificate / Blueprints for new construction and renovation / Parking for two cars / Access to two or more train lines / LDK size 18 tatami mats or more / Interior and exterior renovations / Interior renovations / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage in all rooms / Flat to station / Quiet residential area / LDK size 15 tatami mats or more / Front road 6m or more / Regular lot / Face-to-face kitchen / Lighting on three sides / Two toilets / Bathroom 1 tsubo or more / Exterior renovations / Two-story building / Balconies on two or more sides / South-facing balcony / Heated toilet seat / Underfloor storage / Window in bathroom / Good ventilation / Flooring in all rooms / Wood deck / Walk-in closet / Stairs in living room / City gas / Lighting on two sides in all rooms / Flat ground / Attic storage / Underfloor heating / Low traffic in the area | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
44,800,000 Yen |
|||||
| Information publication date | 2026/1/16 | Next update date | 2026/1/16 | |||
| Important Notices | There are restrictions according to the Landscape Act, restrictions according to the Aviation Act, height zone. *If there is a discrepancy between the information and the actual situation, the actual situation will take precedence. |
|||||
|
|
||||||


