Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,396㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 54.8 million yen (4LDK) | Number of floors | floor (3floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK | Year of construction | 2026/2 | |||
| Structure | Three-story wooden building | Format | Newly built detached house | |||
| Equipment | Soil survey completed / Delivery within fiscal year available / Energy-saving water heater / Supermarket within 10 minutes' walk / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / LDK over 15 tatami mats / Front road over 6m / Corner lot / Vanity with shower / Countertop kitchen / Wide balcony / Two toilets / Bathroom over 3.3 sq. m / Balconies on two or more sides / South-facing balcony / Heated toilet seat / Underfloor storage / Window in bathroom / Intercom with TV monitor / Water-saving toilet / Good ventilation / Flooring in all rooms / Walk-in closet / IH cooking heater / 3 or more stories / Double-glazed or double-glazed windows in all rooms / City gas / Lighting on two sides in all rooms / Elementary school within 10 minutes' walk / Dishwasher / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
54,800,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/9 | |||
| Important Notices | Restricted by the Landscape Act, quasi-fire prevention area, embankment regulation law, type 3 height district, special industrial district. [Notes] Facilities: Tokyo Electric Power Company, city gas, public water supply, public sewerage. Parking: 1 standard car. *All published content is based on drawings at the planning stage and may be subject to change without notice upon completion. If the situation differs from the drawings, the current situation will take precedence. |
|||||
|
|
||||||

