Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,178㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 5280万円~5680万円(4LDK:1号棟+マルチスキップ/2号棟+WIC/5号棟+WIC×2/6号棟+WIC、ワークスペース/7号棟+WIC) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 4LDK:1号棟+マルチスキップ/2号棟+WIC/5号棟+WIC×2/6号棟+WIC、ワークスペース/7号棟+WIC | Year of construction | 2026/3 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Long-Term Excellent Housing Certification Notice / Design Housing Performance Evaluation Report / Construction Housing Performance Evaluation Report (new construction) / Soil Survey Completed / Access to 2 or more train lines / Energy-Saving Water Heater / Supermarket within 10 minutes' walk / Close to city center / System Kitchen / Bathroom Dryer / Good Sunlight / Storage in All Rooms / Quiet Residential Area / LDK (Living, Dining, and Kitchen) 15 Tatami Mats or More / Face-to-Face Kitchen / High-Roof Parking / 2 Toilets / Bathroom 1 Tsubo or More / 2-Story / South-Facing Balcony / Double-Glazed Glass / Heated Toilet Seat / Underfloor Storage / Window in Bathroom / Intercom with TV Monitor / Lush Residential Area / Urban Suburb / Good Ventilation / Walk-in Closet / City Gas / Light on 2 Sides in All Rooms / Elementary School within 10 minutes' walk / Flat Ground / Dishwasher / Low Traffic in the Area / Water Purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
52,800,000 Yen |
|||||
| Information publication date | 2026/4/19 | Next update date | ||||
| Important Notices | 景観法による規制有、準防火地域、地目:畑(後日宅地に変更) 未利用地:約3.39平米×各1/7、約3.84平米×各1/7 5号棟:敷地内に電柱・支線有 7号棟・2号棟:前面道路に電柱・支線有 新設道路:約253.02平米×各1/7、北側約6.0m私道:約248平米×各9/70 文化財保護法 航空法 景観法 最低敷地面積110平米 4・6号棟:2026年2月完成済 |
|||||
|
|
||||||

