Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,296㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 37.8 million yen (1LDK+S (storage room)) | Number of floors | floor (3floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 1LDK+S (storage room) | Year of construction | 2023/12 | |||
| Structure | Three-story wooden building | Format | Used detached house | |||
| Equipment | Ground survey completed / Immediate delivery available / Access to more than two train lines / Within 10 minutes' walk to supermarket / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Flat to station / Quiet residential area / Shower vanity / Barrier-free / Bathroom over 3.3 sq. m / South-facing balcony / Double-glazed windows / Auto bath / Heated toilet seat / Underfloor storage / Bathroom window / Intercom with TV monitor / Lush residential area / Good ventilation / Hardwood floors in all rooms / 3 or more stories / City gas / Shoe closet / All rooms have natural lighting from two sides / Within 10 minutes' walk to elementary school / Flat ground / Underfloor heating / Low traffic in the area / Ventilation and drying in the bathroom, even in humid conditions, is effective in preventing mold. It's also perfect for protecting your laundry, pollen, and PM2.5. Keeping the bathroom heated also helps prevent heat shock. / Underfloor heating / Touchless faucet / Car space (depending on vehicle model) / Bathroom linen closet / SIC / The slab foundation construction method supports the entire base of the building with reinforced concrete. Unlike strip foundation construction, which only runs the foundation around the bottom of the walls, this method distributes the building's weight across a surface. This reduces uneven settlement and prevents moisture from rising from the ground. It provides robust support for your lifestyle. / Earthquake-resistant metal fittings are used at the joints connecting structural materials. The appropriate earthquake-resistant metal fittings are selected for each joint, such as the foundation, base, and columns, to firmly secure the structure. By focusing on these invisible parts, we prevent the building from warping or collapsing due to earthquake shaking and increase the durability of the entire home. / To prevent building deterioration, it is important to eliminate moisture under the floor, which can cause structural corrosion. The foundation packing method is standard, providing 1.5 to 2 times the ventilation performance of conventional construction methods. / Because subsidence may occur in some locations, we conduct ground surveys in advance. If the results indicate soft ground, we will use surface and columnar improvement techniques to create a strong, safe foundation that prevents undue subsidence, providing a safe and secure living environment. / A breathing house with 24-hour ventilation. Forced ventilation is also performed in the attic and within the walls, venting moisture within the building structure to the outside and enhancing its durability. / Double-paned glass prevents indoor heating heat from escaping while simultaneously preventing cold air from entering from outside, greatly enhancing the heating effect. It also prevents condensation on windows during cold winters and rainy seasons. This also prevents stains on curtains and window frames and the growth of unpleasant mold. | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
37,800,000 Yen |
|||||
| Information publication date | 2025/11/11 | Next update date | 2025/11/11 | |||
| Important Notices | Restrictions imposed by the Landscape Act, Height District, Maximum Height Limit, Quasi-fire prevention area, Type 2 Height District, Sewerage treatment area, Minimum lot area (100 square meters), Shadow regulation 3h-2h/4m, Maximum limit 23m, Floor area ratio: Front road width limit, Car space (depending on vehicle type) |
|||||
|
|
||||||

