Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,178㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | ◆ Tachikawa/Nishikicho ◆ Toyota Home Design and Construction "Excellent Stock Housing" | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 1LDK+S (storage room) | Year of construction | 2005/8 | |||
| Structure | Lightweight steel frame, two-story building (frame construction) | Format | Used detached house | |||
| Equipment | Building inspection certificate / defect insurance (Ministry of Land, Infrastructure, Transport and Tourism designated) guaranteed / blueprints for new construction and renovation / access to more than two train lines / supermarket within 10 minutes' walk / close to city center / interior and exterior renovations / south-facing / system kitchen / bathroom dryer / good sunlight / storage space in all rooms / flat to station / shaped lot / vanity with shower / high-roof parking / barrier-free / two toilets / two-story / south-facing balcony / double-glazed glass / heated toilet seat / underfloor storage / window in bathroom / intercom with TV monitor / no front ridge / good ventilation / flooring in all rooms / great views / city gas / BS, CS, CATV / elementary school within 10 minutes' walk / flat ground / storage room / dishwasher / water purifier / built-in garage | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
55,880,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/23 | |||
| Important Notices | Restrictions apply under the Landscape Act, residential land development restriction area, height district, fire prevention area, and shadow restrictions apply. ●The seller will designate a judicial scrivener. ●After the contract is signed, the seller will be responsible for carrying out exterior wall and waterproofing work and interior renovation work before the property is handed over. ●The property will be handed over from mid-April 2026 onwards. |
|||||
|
|
||||||


