Check information around the property
※The pink line shows the route from the property to the selected icon.
※Google APIDisplays the distance and walking minutes from the property to the facility.
Precipitation amount at property location: 1,258㎜/ Year
National average precipitation: 1,590㎜/ Year
Lifeline information such as surrounding shops and facilities
■Property details information
| Property name | 56.8 million yen (3LDK: + family closet) | Number of floors | floor (2floors) | |||
|---|---|---|---|---|---|---|
| Floor plan | 3LDK: + family closet | Year of construction | 2025/4 | |||
| Structure | Two-story wooden building | Format | Newly built detached house | |||
| Equipment | Energy-saving measures / Compatible with Flat 35S / Soil survey completed / Delivery within the year / Parking for two cars / Energy-saving water heater / Supermarket within 10 minutes' walk / Close to city center / South-facing / System kitchen / Bathroom dryer / Good sunlight / Storage space in all rooms / Quiet residential area / LDK over 15 tatami mats / Front road over 6m wide / Garden / Vegetable garden / Vanity with shower / Countertop kitchen / Lighting on three sides / Barrier-free / Two toilets / Bathroom over 3.3 sq. m / Two-story / South-facing balcony / Double-glazed windows / Auto-bath / Heated toilet seat / South garden / Window in bathroom / Intercom with TV monitor / Lush residential area / Urban suburbs / Good ventilation / Flooring in all rooms / Great views / Double-glazed or double-glazed windows in all rooms / Elementary school within 10 minutes' walk / Flat ground / Underfloor heating / Dishwasher / Low traffic volume in the area / Large distance between neighboring houses / All-electric / Water purifier | |||||
| Scheduled move-in date | Insurance | |||||
| Estimated rent |
56,800,000 Yen |
|||||
| Information publication date | 2026/1/15 | Next update date | 2026/1/23 | |||
| Important Notices | There is a boundary line for use (building coverage ratio: 48.61%, floor area ratio: 114.45%). As it is adjacent to a road stipulated in Article 43, consent from the Building Review Board is required for reconstruction. |
|||||
|
|
||||||


